
If you are planning a kitchen remodel in Waterloo, Cedar Falls, or elsewhere in the Cedar Valley, the first question is usually simple: what will it cost?
The short answer: Fishsticks' current planning ranges are about $15,000–$30,000 for a minor kitchen refresh, $30,000–$60,000 for a mid-range remodel, and $60,000–$100,000+ for a high-end renovation. Your final price depends on the existing room, the scope of work, your material selections, and whether the layout changes. These are planning ranges, not a quote. An accurate number requires an on-site look at your kitchen and a detailed written scope.
This guide explains what each range usually covers, what moves a project up or down, and what real Cedar Valley kitchens cost. For flooring and bathroom pricing, see our broader project pricing guide.
Want a number for your kitchen?
Call (319) 987-3091 or request a kitchen-remodel consultation. We will look at your space and prepare a written estimate for your actual scope.
The table below uses the same three ranges published on our kitchen remodeling page and pricing guide. Most kitchens fall between these tiers in some way, so treat the descriptions as typical, not fixed packages.
| Project scope | Planning range | Usually includes | Usually not included |
|---|---|---|---|
| Minor kitchen refresh | $15,000–$30,000 | New cabinets in the existing layout, countertops, flooring, backsplash, and installation. | Moving walls, relocating plumbing or gas, and premium custom cabinetry. |
| Mid-range kitchen remodel | $30,000–$60,000 | Upgraded cabinetry and storage, quartz or similar countertops, tile, flooring, lighting updates, and coordinated trade work. | Major structural changes and highly customized features. |
| High-end kitchen renovation | $60,000–$100,000+ | Complete renovation with premium or custom cabinetry, larger islands, layout changes, custom features such as range hoods, and connected spaces. | Varies by design; work beyond the kitchen is priced as part of the scope. |
Whether appliances, permits, or repairs to concealed conditions are part of your price depends on the scope. Your written estimate spells out what is included and what is not.
Two kitchens of the same size can land in different ranges. These are the factors that matter most:
Cabinetry is usually the largest single cost, followed by countertops and flooring. We have not published a percentage breakdown that applies to every project, but our Cedar Falls kitchen refresh shows how one real $25,000 budget was divided:
In that project, cabinets and their installation made up just over half of the budget. Your split will differ with your selections and scope.
Not sure which range fits your kitchen?
Bring your ideas and rough budget to our Waterloo showroom, or schedule a kitchen consultation. We will tell you honestly what your budget can achieve.
These completed projects show how scope changes the investment. You can see more in our featured kitchen renovations.
This Cedar Falls kitchen kept its layout and focused on brighter white middle-tier cabinetry, new flooring, countertops, and a tile backsplash. After about four weeks of design and material delivery, construction took two weeks. See the Cedar Falls kitchen refresh.
This Waterloo kitchen received sage cabinetry, bright quartz, warm brass details, and smarter storage, with 3D renderings before construction. The kitchen's estimated budget was $60,000 with about three weeks of construction; the connected laundry room was a separate $17,000 scope. See the Waterloo kitchen and laundry renovation.
This Gladbrook project combined a kitchen with rustic hickory cabinets in a Driftwood stain, Ijen Beige quartz, a custom wood range hood, and an oversized island with a wet bar, flooring, and other home updates. The combined quoted scope was about $84,000, installed in phases over roughly seven weeks. See the Gladbrook hickory kitchen.
Keeping appliances, sink, and walls where they are avoids most plumbing, electrical, and framing changes. This is the most direct path to a refresh-level budget.
New cabinets and countertops change how a kitchen looks and works. Because cabinetry is the largest cost, the cabinet line you choose has the biggest effect on where the project lands.
A complete renovation adds lighting, tile, flooring, trade updates, and often an island. It usually falls in the mid-range or high-end tier depending on materials.
Opening walls or moving the kitchen's work areas adds structural, plumbing, electrical, and finish work, plus more design time. The result can transform how a home works, but it is rarely the lowest-cost option.
Plan for two separate stretches of time. Design and material lead time comes first: consultation, measuring, layout, selections, and ordering cabinets and materials. In the Cedar Falls refresh, that took about four weeks. On-site construction typically takes four to eight weeks depending on scope; focused refreshes can move faster, while layout changes and custom cabinetry take longer. You receive a project schedule before construction begins. For planning advice, read when to start planning a kitchen remodel.
Share how you cook, gather, and store, and what is not working in your current kitchen.
We measure the room and develop a layout that fits your goals and budget.
Choose cabinetry, countertops, tile, and flooring in our showroom and confirm the written scope.
You receive a written, project-specific estimate covering the whole scope before work begins.
Cabinets and materials are ordered, and the project is scheduled and coordinated.
Demolition, cabinetry, countertops, tile, flooring, and licensed trade partners are managed by one team, followed by a final walkthrough with you.
Fishsticks is not the lowest-priced option, and we do not try to be. We are a good fit for homeowners who value thoughtful design, quality craftsmanship, clear communication, and one team coordinating the whole project. If you are comparing contractors, our Why Fishsticks page explains how we work and who we serve best.
Often, yes, for a focused refresh that keeps the existing layout. Our Cedar Falls kitchen refresh used a $25,000 budget for middle-tier cabinets, countertops, flooring, and a tile backsplash. Moving walls or plumbing, or choosing premium materials, usually pushes a project beyond that.
Cabinetry is usually the largest single cost. In the Cedar Falls refresh, cabinet materials were $10,000 of the $25,000 budget, with another $2,800 for cabinet installation.
Yes. Relocating a sink, adding plumbing to an island, or moving gas or electrical connections adds trade labor and time compared with keeping fixtures where they are.
It depends on your scope. Some projects include appliance purchase or installation and others do not, so confirm how appliances are handled in your written estimate.
Keep a contingency in your budget for conditions that cannot be seen until demolition, such as subfloor damage or outdated wiring. We can discuss an appropriate amount for your home during the estimate.
A kitchen renovation typically takes four to eight weeks of construction depending on scope, after design and material ordering are complete. You receive a project schedule before construction begins.
Many homeowners plan to live at home during a kitchen remodel. Plan for a temporary kitchen setup, some noise and dust protection, and crew access during working hours.
Ask about financing options when you request your estimate, and we will explain what is currently available.
Yes. We remodel kitchens in Waterloo, Cedar Falls, Waverly, Independence, Gladbrook, and communities throughout the Cedar Valley. Contact us to confirm availability for your address.
Call (319) 987-3091, visit our showroom at 706 Ansborough Ave in Waterloo, or request a consultation online. We review your kitchen, scope, and selections before preparing a written, project-specific estimate.
Let's discuss your renovation goals. Schedule a free consultation today.
Contact UsCustom cabinetry, quartz waterfall islands, statement hoods, butler's pantries and layered lighting — a look at what defines a high-end kitchen remodel in Iowa, and where the money actually goes.
Read MoreWondering when to start planning your kitchen remodel? Learn the ideal timeline, what to expect at each stage, and why a little planning goes a long way — from the Fishsticks team in Waterloo, Iowa.
Read MoreNot sure where to start your kitchen renovation? Learn the first steps, budgeting tips, and design guidance from Fishsticks Flooring, Kitchen & Bath.
Read More